Connectivity in Maidstone
DistrictThe east of the South East. 191,415 people in 393 square kilometres.
5 layers about connectivity for Maidstone, each at the level its publisher released it, with its own date and source.
Gigabit coverage by output area
Connected Nations (Ofcom) · January 2026
Maidstone’s 523 output areas range from 0.0% to 100.0%.
Gigabit broadband coverage
CouncilIn Maidstone, 80.5% of homes and businesses could get gigabit-capable broadband in January 2026.
For the UK as a whole, the figure was 87.8%.
- Against England
- 9% lower88.4%
- Against the UK
- 8% lower87.8%
Full-fibre broadband coverage
CouncilIn Maidstone, 71.4% of homes and businesses could get full-fibre broadband in January 2026.
For the UK as a whole, the figure was 81.0%.
- Against England
- 12% lower81.3%
- Against the UK
- 12% lower81.0%
Full-fibre take-up
CouncilIn Maidstone, 52% of the homes and businesses that could get full fibre had a full-fibre connection in January 2026.
For the UK as a whole, the figure was 47%.
- Against England
- 13% higher46%
- Against the UK
- 11% higher47%
4G coverage from all four networks
CouncilIn Maidstone, 98.75% of homes and businesses had outdoor 4G coverage from all four mobile networks in January 2026.
For the UK as a whole, the figure was 99.22%.
- Against England
- 1% lower99.35%
- Against the UK
- About the same99.22%
Broadband by postcode
PostcodeGreat Britain onlyPublished as points, so there is no single figure for Maidstone. The map shows each one.